COHORT SCREENING · GIT-EC-2026

AI7-C1 Silicon Bring-Up & FPGA Verification Assessment

Welcome, KLS GIT E&C engineers. This 45-minute technical screening identifies core hardware interns to work directly on the AI7-C1 Physics-Informed Neural Operator Silicon IP — spanning Verilog RTL verification, AMD Xilinx Vivado synthesis, and physical Artix-7 FPGA oscilloscope validation.

45 min
Timed Online Assessment
19 + 2
MCQs & Live Verilog Tasks
100 pts
70 Auto · 30 RTL Design
Assessment Blueprint
01
Digital Logic, Fixed-Point & Timing
STA Fmax, Q8.8 arithmetic, 2's complement saturation, CDC, pipelining
18 pts
02
Verilog RTL Reading & Bug Spotting
Blocking vs non-blocking, latches, signed pitfalls, AXI4-Lite handshake
24 pts
03
FPGA Flow (Vivado) & DSO Lab Bench
DSP48E1, XDC constraints, WNS debugging, DSO latency cursors & 10X probes
28 pts
04
Practical Verilog RTL Design Challenges
Write synthesizable safety_clamp & latency_monitor modules
30 pts
⚡
Proctoring & Fairness Notice: Progress auto-saves locally if your browser refreshes. Switching browser tabs or pasting external code is recorded in your integrity telemetry. Top scorers will be invited for a live 15-minute technical walkthrough of their Verilog solutions.

Candidate Registration

Enter your official KLS GIT academic details to begin the screening test.